Lafarge Cement Factory Rashidiyah, Tafilah (6.6KV – M.V. Room)

FM200 Suppression System with 9 Cylinder (filled with 1207 Kg) installed inside the 6.6KV M.V. Room at Lafarge Cement Factory in Rashidiyah, Tafilah.